Submit an Article
Become a reviewer
Vol 117
Pages:
32-34
Download volume:
RUS
Article

Experience of struggle against overgrowing of the main copper concentrate slurry lines with mineral-organic deposits

Authors:
Yu. N. Gulyaev
V. D. Negerdus
Date submitted:
1987-09-10
Date accepted:
1987-11-06
Date published:
1988-11-25

Abstract

With the transfer of industrial enterprises to full recycled water supply with process water there appeared the phenomenon of overgrowing of main pulp lines and water lines of recycled water with mineral-organic deposits, which gradually reduced the throughput capacity with subsequent blockage.

Область исследования:
(Archived) Without section
Go to volume 117

Similar articles

To the issue of static and total pressure of a mine fan
1988 S. S. Smorodin
Results of oceanic tests of the bottom soil investigation unit
1988 I. P. Timofeev, N. K. Ulashchik, E. M. Ulyanov
Device for pump capacity change in a model stand of hydraulic drive of a drilling machine
1988 K. N. Podozerov
Mine hoisting installations with equalizing devices of the reconstructed mines of PA Vorkutaugol
1988 V. A. Kabanov
Water and air supply systems of underground mines and their role in stray current propagation
1988 E. A. Kudashev, A. F. Dubinin, V. A. Popov, M. I. Berkman
Influence of mechanodegradation on the value of the Toms effect
1988 A. S. Medvedev, A. E. Gorshtein, M. M. Kryzhanovsky