Submit an Article
Become a reviewer
Vol 117
Pages:
32-34
Download volume:
RUS
Article

Experience of struggle against overgrowing of the main copper concentrate slurry lines with mineral-organic deposits

Authors:
Yu. N. Gulyaev
V. D. Negerdus
Date submitted:
1987-09-10
Date accepted:
1987-11-06
Date published:
1988-11-25

Abstract

With the transfer of industrial enterprises to full recycled water supply with process water there appeared the phenomenon of overgrowing of main pulp lines and water lines of recycled water with mineral-organic deposits, which gradually reduced the throughput capacity with subsequent blockage.

Область исследования:
(Archived) Without section
Go to volume 117

Similar articles

To the issue of static and total pressure of a mine fan
1988 S. S. Smorodin
Dynamics of ropes in hoisting installations with friction pulleys and tensioning devices
1988 S. S. Naumov
Mine hoisting installations with equalizing devices of the reconstructed mines of PA Vorkutaugol
1988 V. A. Kabanov
Results of oceanic tests of the bottom soil investigation unit
1988 I. P. Timofeev, N. K. Ulashchik, E. M. Ulyanov
Influence of relaxation oscillations of a brake shoe on the braking process
1988 M. M. Vetyukov, M. Yu. Platovskikh
Method of determination of optimum parameters of a lifting installation on the computer
1988 N. P. Boytsov, L. N. Zuev