Experience of struggle against overgrowing of the main copper concentrate slurry lines with mineral-organic deposits
Abstract
With the transfer of industrial enterprises to full recycled water supply with process water there appeared the phenomenon of overgrowing of main pulp lines and water lines of recycled water with mineral-organic deposits, which gradually reduced the throughput capacity with subsequent blockage.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Dynamics of ropes in hoisting installations with friction pulleys and tensioning devices
1988 S. S. Naumov
Device for pump capacity change in a model stand of hydraulic drive of a drilling machine
1988 K. N. Podozerov