Submit an Article
Become a reviewer
Vol 123
Pages:
116-123
Download volume:
RUS
Article

Adaptability of new generations of mechanized fasteners during mining of heavy-roofed formations

Authors:
Z. I. Yalyshev
S. V. Polyakov
V. N. Kovalev
O. T. Stepanenko
Date submitted:
1989-09-05
Date accepted:
1989-11-13
Date published:
1990-12-30

Abstract

At present, a significant number of mechanized complexes, divided conventionally into three generations, have been created and are being developed for the development of declivity strata.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 123

Similar articles

To the question of estimation of the condition of the underworked rocks of the water protection strata at potash deposits
1990 N. M. Proskuryakov, O. V. Kovalev
Control of the stress-strain state of the massif based on the results of radiometric sounding
1990 V. I. Kimkov
Prediction of bottom-hole movement based on the data of the early warning system of roof collapses
1990 A. A. Borisov
Study of stratification of interbed rocks
1990 N. F. Dotsul, I. V. Sivukhin, S. A. Grafkin
Study of the influence of the roof behavior on cleaning works in the conditions of the 60th Anniversary of the USSR mine of PA "Yuzhkuzbassugol"
1990 M. Yu. Pakhtusov
Application of V.Z.Vlasov's method in elastic-plastic approximation to the problems of mining geomechanics
1990 V. P. Tereshenko