Submit an Article
Become a reviewer
Vol 123
Pages:
41-46
Download volume:
RUS
Article

Estimation of expediency of using advance overworking as a method of preventing dumps in the faces of overworked seams.

Authors:
V. P. Zubov
Date submitted:
1989-09-06
Date accepted:
1989-11-10
Date published:
1990-12-30

Abstract

Advance mining of protective seams is widely known nowadays as a regional preventive method of preventing mining strikes and sudden releases of coal and gas.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 123

Similar articles

Determination of parameters of explosion-hydro treatment of hard-to-collapse roof of hollow coal seams
1990 V. G. Bezkaravayny, V. I. Timofeev, A. A. Ryskunov
Control of the stress-strain state of the massif based on the results of radiometric sounding
1990 V. I. Kimkov
Methodology of selection of the method of preparation of coal seam strata strata preparation.
1990 P. V. Shipanov
Peculiarities of aimless development of converging seams
1990 P. N. Dmitriev
Investigation of rock pressure manifestation by the method of models in conditions of pneumatic fasteners application
1990 G. V. Ovcharenko
Study of the influence of the roof behavior on cleaning works in the conditions of the 60th Anniversary of the USSR mine of PA "Yuzhkuzbassugol"
1990 M. Yu. Pakhtusov