Submit an Article
Become a reviewer
Vol 123
Pages:
41-46
Download volume:
RUS
Article

Estimation of expediency of using advance overworking as a method of preventing dumps in the faces of overworked seams.

Authors:
V. P. Zubov
Date submitted:
1989-09-06
Date accepted:
1989-11-10
Date published:
1990-12-30

Abstract

Advance mining of protective seams is widely known nowadays as a regional preventive method of preventing mining strikes and sudden releases of coal and gas.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 123

Similar articles

Application of V.Z.Vlasov's method in elastic-plastic approximation to the problems of mining geomechanics
1990 V. P. Tereshenko
Methodology of selection of the method of preparation of coal seam strata strata preparation.
1990 P. V. Shipanov
Realization of the principle of technological sequence at mathematical modeling of geomechanical processes
1990 T. A. Kazakova
Study of stratification of interbed rocks
1990 N. F. Dotsul, I. V. Sivukhin, S. A. Grafkin
Calculation of Extreme Values of Support Pressure in the Formation and Stresses in Heterogeneous Roof Rocks
1990 O. V. Kovalev, V. G. Labazin
Influence of geomechanical factors on the condition of the roof of mine workings
1990 I. A. Simansky, A. A. Starodubtsev