Submit an Article
Become a reviewer
Vol 123
Pages:
41-46
Download volume:
RUS
Article

Estimation of expediency of using advance overworking as a method of preventing dumps in the faces of overworked seams.

Authors:
V. P. Zubov
Date submitted:
1989-09-06
Date accepted:
1989-11-10
Date published:
1990-12-30

Abstract

Advance mining of protective seams is widely known nowadays as a regional preventive method of preventing mining strikes and sudden releases of coal and gas.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 123

Similar articles

Influence of geomechanical factors on the condition of the roof of mine workings
1990 I. A. Simansky, A. A. Starodubtsev
Prediction of bottom-hole movement based on the data of the early warning system of roof collapses
1990 A. A. Borisov
Investigation of rock pressure manifestation by the method of models in conditions of pneumatic fasteners application
1990 G. V. Ovcharenko
Physical bases of the electrometric method of research of the process of deformation of a rock massif
1990 O. V. Sergeev, E. A. Markina, I. A. Livshits
Methodology of selection of the method of preparation of coal seam strata strata preparation.
1990 P. V. Shipanov
Control of the stress-strain state of the massif based on the results of radiometric sounding
1990 V. I. Kimkov