Submit an Article
Become a reviewer
Vol 123
Pages:
41-46
Download volume:
RUS
Article

Estimation of expediency of using advance overworking as a method of preventing dumps in the faces of overworked seams.

Authors:
V. P. Zubov
Date submitted:
1989-09-06
Date accepted:
1989-11-10
Date published:
1990-12-30

Abstract

Advance mining of protective seams is widely known nowadays as a regional preventive method of preventing mining strikes and sudden releases of coal and gas.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 123

Similar articles

Application of V.Z.Vlasov's method in elastic-plastic approximation to the problems of mining geomechanics
1990 V. P. Tereshenko
Mine testing of rod supports at alluvial deposits of permafrost rocks
1990 S. A. Tolstunov, A. V. Montikov
Influence of geomechanical factors on the condition of the roof of mine workings
1990 I. A. Simansky, A. A. Starodubtsev
Investigation of rock pressure manifestation by the method of models in conditions of pneumatic fasteners application
1990 G. V. Ovcharenko
Adaptability of new generations of mechanized fasteners during mining of heavy-roofed formations
1990 Z. I. Yalyshev, S. V. Polyakov, V. N. Kovalev, O. T. Stepanenko
Prediction of bottom-hole movement based on the data of the early warning system of roof collapses
1990 A. A. Borisov