Estimation of expediency of using advance overworking as a method of preventing dumps in the faces of overworked seams.
Authors:
Abstract
Advance mining of protective seams is widely known nowadays as a regional preventive method of preventing mining strikes and sudden releases of coal and gas.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Determination of parameters of explosion-hydro treatment of hard-to-collapse roof of hollow coal seams
1990 V. G. Bezkaravayny, V. I. Timofeev, A. A. Ryskunov
Control of the stress-strain state of the massif based on the results of radiometric sounding
1990 V. I. Kimkov
Methodology of selection of the method of preparation of coal seam strata strata preparation.
1990 P. V. Shipanov