Submit an Article
Become a reviewer
Vol 128
Pages:
121-125
Download volume:
RUS
Research article
Without section

Control system of the frontal coal mining unit module

Authors:
B. M. Borisov
V. V. Gabov
I. A. Efimov
E. A. Zagrivny
Yu. V. Yaskov
Date submitted:
1990-11-10
Date accepted:
1991-01-11
Date published:
1991-12-29

Abstract

The principle scheme of the unit of modular design for frontal mining of coal seams was developed at the Department of Mining Electromechanics of the branch of LMI in Vorkuta.

Go to volume 128

Similar articles

Regeneration in DC link frequency inverters without slave inverter application
1991 A. V. Shipulin
Direct frequency converter with capacitive energy storages
1991 A. V. Shipulin
Transients in alternating current electric machines with magnetic saturation
1991 V. A. Dartau
Calculation of the air pipelines of the mine compressor unit on the computer
1991 V. V. Klassen, S. S. Smorodin
Application of thyristor rectifiers in bridge excitation schemes of excavator generators
1991 V. V. Rudakov, A. S. Soloviev, N. A. Ambartsumyan
AC drive control with power constancy
1991 E. V. Raspopov