Control system of the frontal coal mining unit module
Abstract
The principle scheme of the unit of modular design for frontal mining of coal seams was developed at the Department of Mining Electromechanics of the branch of LMI in Vorkuta.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Current control circuit of thyristor drive with differential correction and PI-corrector
1991 V. V. Rudakov
Multi-motor electric drive TP-D with common current loop of subordinate regulation
1991 V. V. Rudakov