Submit an Article
Become a reviewer
Vol 136
Pages:
54-60
Download volume:
RUS
Article

Peculiarities of geothermal well development technology

Authors:
Yu. M. Pariysky
About authors
  • Saint Petersburg Mining Institute
Date submitted:
1992-07-25
Date accepted:
1992-09-17
Date published:
1993-06-03

Abstract

The complex of works on causing the inflow of liquid from the productive zone (well development) is the final operation in the technological cycle of well construction for liquid and gaseous minerals, the quality of execution of which largely determines the possibility of obtaining commercial inflow of liquid and the efficiency of drilling operations.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 136

Similar articles

Contact problem of dynamic interaction of diamond crown with rock massif
1993 L. K. Gorshkov, G. G. Zaretsky-Feoktistov, R. K. Bogdanov
Technological peculiarities of well plugging using SSC complex
1993 N. I. Nikolaev, L. K. Gorshkov
Drilling wells under water influx conditions using gas-liquid mixtures
1993 A. M. Yakovlev
Calculation of fusion core drilling speed with liquid coolant
1993 B. B. Kudryashov, N. G. Menshikov
Hydraulic resistances to movement of the drilling rig on the cable in the borehole during up-and-down operations
1993 N. I. Vasiliev, B. B. Kudryashov
Study of plugging compositions for artificial filters
1993 L. S. Strelenya, N. I. Slyusarev, Yu. G. Rudometov