Peculiarities of geothermal well development technology

Authors:
Yu. M. Pariysky
About authors
  • Saint Petersburg Mining Institute
Date submitted:
1992-07-25
Date accepted:
1992-09-17
Date published:
1993-06-03

Abstract

The complex of works on causing the inflow of liquid from the productive zone (well development) is the final operation in the technological cycle of well construction for liquid and gaseous minerals, the quality of execution of which largely determines the possibility of obtaining commercial inflow of liquid and the efficiency of drilling operations.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 136

Similar articles

Calculation of fusion core drilling speed with liquid coolant
1993 B. B. Kudryashov, N. G. Menshikov
Ways of creation of means of automatic drilling of extended precisely directed wells
1993 N. P. Boytsov, V. K. Bubok
Fusion drilling is one of the methods for solving geomechanics problems
1993 A. M. Shkurko
Study of plugging compositions for artificial filters
1993 L. S. Strelenya, N. I. Slyusarev, Yu. G. Rudometov
Selection of criterion and calculation method for drill string bottom layouts for core drilling
1993 A. G. Kalinin, A. F. Fedorov, K. M. Solodky, A. S. Povalikhin, G. V. Korosteleva
Drilling wells under water influx conditions using gas-liquid mixtures
1993 A. M. Yakovlev