Peculiarities of geothermal well development technology

Authors:
Yu. M. Pariysky
About authors
  • Saint Petersburg Mining Institute
Date submitted:
1992-07-25
Date accepted:
1992-09-17
Date published:
1993-06-03

Abstract

The complex of works on causing the inflow of liquid from the productive zone (well development) is the final operation in the technological cycle of well construction for liquid and gaseous minerals, the quality of execution of which largely determines the possibility of obtaining commercial inflow of liquid and the efficiency of drilling operations.

Область исследования:
(Archived) Without section
Go to volume 136

Similar articles

Temperature regime of stepped diamond bits during drilling with foam
1993 A. A. Yakovlev, A. V. Kozlov
Use of the Maxwell-Cremona diagram in the calculation of derricks
1993 I. G. Shelkovnikov, N. D. Mikhailova
Technological peculiarities of well plugging using SSC complex
1993 N. I. Nikolaev, L. K. Gorshkov
Calculation of fusion core drilling speed with liquid coolant
1993 B. B. Kudryashov, N. G. Menshikov
Selection of criterion and calculation method for drill string bottom layouts for core drilling
1993 A. G. Kalinin, A. F. Fedorov, K. M. Solodky, A. S. Povalikhin, G. V. Korosteleva
Analysis of the contact melting process during well drilling for media with nonlinear thermophysical and rheological characteristics
1993 V. K. Chistyakov, V. A. Chugunov