Peculiarities of geothermal well development technology

Authors:
Yu. M. Pariysky
About authors
  • Saint Petersburg Mining Institute
Date submitted:
1992-07-25
Date accepted:
1992-09-17
Date published:
1993-06-03

Abstract

The complex of works on causing the inflow of liquid from the productive zone (well development) is the final operation in the technological cycle of well construction for liquid and gaseous minerals, the quality of execution of which largely determines the possibility of obtaining commercial inflow of liquid and the efficiency of drilling operations.

Область исследования:
(Archived) Without section
Go to volume 136

Similar articles

Tubeless consolidation of unstable intervals of exploration wells
1993 N. I. Nikolaev
Technological peculiarities of well plugging using SSC complex
1993 N. I. Nikolaev, L. K. Gorshkov
Temperature regime of the borehole being drilled and the surrounding frozen rock massif
1993 A. V. Kozlov, A. A. Yakovlev
Calculation of fusion core drilling speed with liquid coolant
1993 B. B. Kudryashov, N. G. Menshikov
Fusion drilling is one of the methods for solving geomechanics problems
1993 A. M. Shkurko
Selection of criterion and calculation method for drill string bottom layouts for core drilling
1993 A. G. Kalinin, A. F. Fedorov, K. M. Solodky, A. S. Povalikhin, G. V. Korosteleva