Submit an Article
Become a reviewer
Vol 136
Pages:
54-60
Download volume:
RUS
Article

Peculiarities of geothermal well development technology

Authors:
Yu. M. Pariysky
About authors
  • Saint Petersburg Mining Institute
Date submitted:
1992-07-25
Date accepted:
1992-09-17
Date published:
1993-06-03

Abstract

The complex of works on causing the inflow of liquid from the productive zone (well development) is the final operation in the technological cycle of well construction for liquid and gaseous minerals, the quality of execution of which largely determines the possibility of obtaining commercial inflow of liquid and the efficiency of drilling operations.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 136

Similar articles

Experience in creating long horizontally directed wells
1993 Yu. B. Sinai, V. Kh. Samigulin
Assessment of the complexity of diamond drilling conditions
1993 Yu. M. Pariysky, M. Bundy
Technological peculiarities of well plugging using SSC complex
1993 N. I. Nikolaev, L. K. Gorshkov
Evaluation of diamond drilling efficiency by mist blowing
1993 A. T. Alexandrov, M. Azam
Temperature regime of the borehole being drilled and the surrounding frozen rock massif
1993 A. V. Kozlov, A. A. Yakovlev
Current state and prospects of geological exploration drilling development
1993 I. S. Afanasyev