<?xml version="1.0" encoding="UTF-8"?>
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" dtd-version="1.4" article-type="research-article">
  <front>
    <journal-meta>
      <journal-id journal-id-type="issn">2411-3336</journal-id>
      <journal-id journal-id-type="eissn">2541-9404</journal-id>
      <journal-title-group>
        <journal-title xml:lang="ru">Записки Горного института</journal-title>
        <journal-title xml:lang="en">Journal of Mining Institute</journal-title>
      </journal-title-group>
      <publisher>
        <publisher-name xml:lang="ru">Санкт-Петербургский горный университет императрицы Екатерины ΙΙ</publisher-name>
        <publisher-name xml:lang="en">Empress Catherine II Saint Petersburg Mining University</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id custom-type="pmi" pub-id-type="custom">pmi-9475</article-id>
      <article-id pub-id-type="uri">https://pmi.spmi.ru/pmi/article/view/9475</article-id>
      <article-categories>
        <subj-group subj-group-type="section-heading" xml:lang="ru">
          <subject>Разработка месторождений полезных ископаемых</subject>
        </subj-group>
        <subj-group subj-group-type="section-heading" xml:lang="en">
          <subject>Development of mineral deposits</subject>
        </subj-group>
      </article-categories>
      <title-group>
        <article-title xml:lang="en">Effective boundaries of chamber-and-pillar development system options</article-title>
        <trans-title-group xml:lang="ru">
          <trans-title>Эффективные границы применения вариантов камерно-столбовой системы разработки</trans-title>
        </trans-title-group>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author" corresp="yes">
          <name name-style="eastern">
            <surname>Fitsak</surname>
            <given-names>V. V.</given-names>
          </name>
          <name-alternatives>
            <name name-style="eastern" xml:lang="ru">
              <surname>Фицак</surname>
              <given-names>В. В.</given-names>
            </name>
            <name name-style="western" xml:lang="en">
              <surname>Fitsak</surname>
              <given-names>V. V.</given-names>
            </name>
          </name-alternatives>
          <email>pmi@spmi.ru</email>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <aff-alternatives id="aff1">
          <aff>
            <institution xml:lang="ru">Санкт-Петербургский государственный горный институт им. Г.В.Плеханова (технический университет) (Россия)</institution>
          </aff>
          <aff>
            <institution xml:lang="en">G.V. Plekhanov Saint Petersburg Mining University (Russia)</institution>
          </aff>
        </aff-alternatives>
      </contrib-group>
      <pub-date pub-type="epub" iso-8601-date="2002-05-20">
        <day>20</day>
        <month>05</month>
        <year>2002</year>
      </pub-date>
      <pub-date date-type="collection">
        <year>2002</year>
      </pub-date>
      <volume>150</volume>
      <issue>2</issue>
      <fpage>54</fpage>
      <lpage>56</lpage>
      <history>
        <date date-type="received" iso-8601-date="2001-07-17">
          <day>17</day>
          <month>07</month>
          <year>2001</year>
        </date>
        <date date-type="accepted" iso-8601-date="2001-08-30">
          <day>30</day>
          <month>08</month>
          <year>2001</year>
        </date>
        <date date-type="rev-recd" iso-8601-date="2002-05-20">
          <day>20</day>
          <month>05</month>
          <year>2002</year>
        </date>
      </history>
      <permissions>
        <copyright-statement xml:lang="ru">© 2002 В. В. Фицак</copyright-statement>
        <copyright-statement xml:lang="en">© 2002 V. V. Fitsak</copyright-statement>
        <copyright-year>2002</copyright-year>
        <copyright-holder xml:lang="ru">В. В. Фицак</copyright-holder>
        <copyright-holder xml:lang="en">V. V. Fitsak</copyright-holder>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/4.0" xml:lang="ru">
          <license-p>Эта статья доступна по лицензии Creative Commons Attribution 4.0 International (CC BY 4.0)</license-p>
        </license>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/4.0" xml:lang="en">
          <license-p>This article is licensed under a Creative Commons Attribution 4.0 International License (CC BY 4.0)</license-p>
        </license>
      </permissions>
      <self-uri xlink:type="simple" xlink:href="https://pmi.spmi.ru/pmi/article/view/9475">https://pmi.spmi.ru/pmi/article/view/9475</self-uri>
      <abstract xml:lang="ru">
        <p>Одна из главных негативных особенностей группы камерно-столбовых систем разработки ^ вы­сокие потери руды в оставляемых целиках, с ростом глубины ведения горных работ размеры целиков увеличиваются, и потери руды соответственно возрастают, достигая 40-60 %. Таким образом, приме­няемые на малых и средних глубинах варианты камерно-столбовой системы разработки с погружени­ем горных работ на большие глубины становятся неэффективными технически и экономически. Многостадийные варианты этой системы разработки, в частности с выемкой камер первой оче­реди и последующей их закладкой, получили опытное и промышленное применение, в том числе и на СУБРе. В связи с увеличением глубины горных работ важной задачей в условиях СУБРа становится оп­ределение границ экономической эффективности и дальнейшего применения классических вариантов камерно-столбовой системы и перехода на варианты с многостадийной выемкой. Для проектирования отработки новых, более глубоких горизонтов, необходимо оптимизировать параметры применения вариантов системы разработки. По разработанной экономико-математической модели была составлена программа расчета се­бестоимости добычи руды, результаты расчетов программы переведены в электронные таблицы EXEL, где были получены эффективные границы применения различных вариантов камерно- столбовой системы разработки.</p>
      </abstract>
      <abstract xml:lang="en">
        <p>One of the main negative features of the group of chamber-and-pillar systems of development are high losses of ore in the left pillars, with increasing depth of mining works the size of pillars increases, and ore losses increase accordingly, reaching 40-60%. Thus, the variants of chamber-and-pillar mining system used at small and medium depths with plunging of mining works to great depths become technically and economically ineffective. Multistage variants of this development system, in particular with excavation of chambers of the first stage and their subsequent backfilling, received experimental and industrial application, including at SUBR. In connection with the increase in the depth of mining operations, an important task in conditions of SUBR is to determine the limits of economic efficiency and further application of classical variants of the chamber-and-pillar system and transition to variants with multistage excavation. In order to design the mining of new, deeper horizons, it is necessary to optimize the parameters of applying the variants of the development system. According to the developed economic-mathematical model the program of ore mining cost calculation was made, the results of calculations of the program were transferred to the electronic tables EXEL, where the effective limits of different variants of chamber-and-pillar system of development were received.</p>
      </abstract>
    </article-meta>
  </front>
  <body/>
  <back>
    <ref-list/>
  </back>
</article>
