<?xml version="1.0" encoding="UTF-8"?>
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" dtd-version="1.4" article-type="research-article">
  <front>
    <journal-meta>
      <journal-id journal-id-type="issn">2411-3336</journal-id>
      <journal-id journal-id-type="eissn">2541-9404</journal-id>
      <journal-title-group>
        <journal-title xml:lang="ru">Записки Горного института</journal-title>
        <journal-title xml:lang="en">Journal of Mining Institute</journal-title>
      </journal-title-group>
      <publisher>
        <publisher-name xml:lang="ru">Санкт-Петербургский горный университет императрицы Екатерины ΙΙ</publisher-name>
        <publisher-name xml:lang="en">Empress Catherine II Saint Petersburg Mining University</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id custom-type="pmi" pub-id-type="custom">pmi-15093</article-id>
      <article-id pub-id-type="uri">https://pmi.spmi.ru/pmi/article/view/15093</article-id>
      <article-categories>
        <subj-group subj-group-type="section-heading" xml:lang="ru">
          <subject>Статьи</subject>
        </subj-group>
        <subj-group subj-group-type="section-heading" xml:lang="en">
          <subject>Articles</subject>
        </subj-group>
      </article-categories>
      <title-group>
        <article-title xml:lang="en">Rationalization of excavation work based on Stakhanov’s methods of labor organization in mining industry</article-title>
        <trans-title-group xml:lang="ru">
          <trans-title>Рационализация экскаваторных работ на базе стахановских методов организации труда в горной промышленности</trans-title>
        </trans-title-group>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Arkhipovich</surname>
            <given-names>N. I.</given-names>
          </name>
          <name-alternatives>
            <name name-style="eastern" xml:lang="ru">
              <surname>Архипович</surname>
              <given-names>Н. И.</given-names>
            </name>
            <name name-style="western" xml:lang="en">
              <surname>Arkhipovich</surname>
              <given-names>N. I.</given-names>
            </name>
          </name-alternatives>
          <email>pmi@spmi.ru</email>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <aff-alternatives id="aff1">
          <aff>
            <institution xml:lang="ru"> (Россия)</institution>
          </aff>
          <aff>
            <institution xml:lang="en"> (Russia)</institution>
          </aff>
        </aff-alternatives>
      </contrib-group>
      <pub-date pub-type="epub" iso-8601-date="1939-07-31">
        <day>31</day>
        <month>07</month>
        <year>1939</year>
      </pub-date>
      <pub-date date-type="collection">
        <year>1939</year>
      </pub-date>
      <volume>12</volume>
      <issue>3</issue>
      <fpage>123</fpage>
      <lpage>144</lpage>
      <history>
        <date date-type="received" iso-8601-date="1938-09-23">
          <day>23</day>
          <month>09</month>
          <year>1938</year>
        </date>
        <date date-type="accepted" iso-8601-date="1938-11-21">
          <day>21</day>
          <month>11</month>
          <year>1938</year>
        </date>
        <date date-type="rev-recd" iso-8601-date="1939-07-31">
          <day>31</day>
          <month>07</month>
          <year>1939</year>
        </date>
      </history>
      <permissions>
        <copyright-statement xml:lang="ru">© 1939 Н. И. Архипович</copyright-statement>
        <copyright-statement xml:lang="en">© 1939 N. I. Arkhipovich</copyright-statement>
        <copyright-year>1939</copyright-year>
        <copyright-holder xml:lang="ru">Н. И. Архипович</copyright-holder>
        <copyright-holder xml:lang="en">N. I. Arkhipovich</copyright-holder>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/4.0" xml:lang="ru">
          <license-p>Эта статья доступна по лицензии Creative Commons Attribution 4.0 International (CC BY 4.0)</license-p>
        </license>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/4.0" xml:lang="en">
          <license-p>This article is licensed under a Creative Commons Attribution 4.0 International License (CC BY 4.0)</license-p>
        </license>
      </permissions>
      <self-uri xlink:type="simple" xlink:href="https://pmi.spmi.ru/pmi/article/view/15093">https://pmi.spmi.ru/pmi/article/view/15093</self-uri>
      <abstract xml:lang="ru">
        <p>Задача настоящей темы — разобрать основные условия работы экскаваторов типа механической лопаты, имеющих (сравнительно с другими типами) максимальное применение на наших горных предприятиях; на примере горы Магнитной, Высокой и Еленовских карьеров изучить, проанализировать и обобщить опыт работы экскаваторщиков; установить пути наиболее рациональной организации экскаваторных работ. Приведенные выше причины простоев экскаватора и его непроизводительного использования являются главнейшими и бесспорно в подавляющей степени устранимыми. Если обратиться к прочим причинам, то они могут быть исчерпаны следующим перечнем: заправка и смазка экскаватора, текущий ремонт, аварийный ремонт, перецепка кабеля, смена троса, очистка ковша, подготовка пути, отсутствие энергии, отсутствие запасных частей, отсутствие контактной сети, смена бригад, прочие. Значительная часть этих причин правильной организацией всего рудничного хозяйства, слаженностью всех цехов и ответственным руководством и наблюдением инженерно-технического персонала могут быть также устранены, представляя резерв для повышения производительности экскаватора.</p>
      </abstract>
      <abstract xml:lang="en">
        <p>The purpose of this topic is to analyze the basic operating conditions of excavators such as a mechanical shovel, which have (compared to other types) the maximum application at our mining enterprises; using the example of Mounts Magnitnaya, Vysokaya and Elenovskie quarries, study, analyze and generalize the experience of excavator operators; establish ways of the most rational organization of excavation work. The above reasons for excavator downtime and its unproductive use are the most important and undoubtedly overwhelmingly removable. If we turn to other reasons, they can be exhausted by the following list: refueling and lubrication of the excavator, routine repairs, emergency repairs, cable re-hooking, cable change, bucket cleaning, path preparation, lack of energy, lack of spare parts, lack of contact network, change of crews , others. A significant part of these reasons can also be eliminated by proper organization of the entire mine economy, coherence of all workshops and responsible management and supervision of engineering and technical personnel, representing a reserve for increasing the productivity of the excavator.</p>
      </abstract>
      <kwd-group xml:lang="ru">
        <title>Ключевые слова</title>
        <kwd>-</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body/>
  <back>
    <ref-list>
      <ref id="ref1">
        <label>1</label>
        <mixed-citation xml:lang="ru">-</mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>
