Submit an Article
Become a reviewer
Problems in geodynamic safety in the exploration of solid deposits

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2016-12-13
Date published:
2010-04-01

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Go to volume 188

Similar articles

Control of dynamic rock pressure manifestations in mining the «Antey» deposit
2010 I. Yu. Rasskazov, G. A. Kursakin, B. G. Saksin, A. A. Filinkov, V. S. Svyatetskii, B. A. Prosekin
Prediction of dynamic manifestations of rock pressure in the all over automated longwalls
2010 M. Roiter, V. Kurfyurst, K. Mairkhofer, Yu. Veksler
Ecologycal and geodynamic safety and problems in industrial ecological monitoring at objects of an oil-gas complex
2010 A. I. Nikonov, O. V. Luk"yanov