The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit

Authors:
A. G. Protosenya1
D. N. Petrov2
K. G. Sinyakin3
G. A. Martemyanova4
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
  • 4 — «Metal-groupp» Co.Ltd., «Yakovlevskiy pit»
Date submitted:
2010-08-28
Date accepted:
2010-10-04
Date published:
2011-02-01

Abstract

The methodic of the field observation for the processes of deep benchmark displacements and configuration of the local observing station is offered. The analysis of the results of the field observations for the displacements of the ore pillar is accomplished, the isolines of settling and the isolines of the average speed of settling of the ore massif is offered.

Go to volume 190

Similar articles

Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak
Development of strains in uniform slopes with phased mining
2011 A. M. Mochalov, A. V. Chebakov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Technology of «cold» briquetting of rich ores of the Jakovlevsky deposit
2011 V. L. Trushko, R. E. Dashko, V. B. Kuskov, A. S. Klyamko
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko