The mining-transport equipment in technological schemes with application of the mobile crushing equipment represents difficult mining system with consecutive and parallel connection of separate technological elements. Reliability of system is defined on the basis of reliability of its components.

Go to volume 190

Similar articles

Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak
Providing of safe conditions for mining оf shaftbottom protective pillars in deep ore mines at Talnakh
2011 V. A. Zvezdkin, V. N. Karenin, A. G. Anokhin