Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2016-12-05
Date published:
2011-02-01

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Go to volume 190

Similar articles

Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev
Influence of a condition of a regional zone of a layer on the mechanism of occurrence of explosions of methane on collieries
2011 S. A. Tolstunov
Subsidence and deformations of layers of the massif of rocks with formation of technogenic water spending cracks
2011 V. N. Gusev, E. S. Rozhnov