Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
- 1 — Saint Petersburg State Mining University
- 2 — Saint Petersburg State Mining University
- 3 — «Giproshaht»
Date submitted:
2016-11-23
Date published:
2012-01-01
Abstract
Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.