Abstract

Development water sated tailing dump are accompanied explosive failure banks  even  at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the  top  platform  tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Go to volume 195

Similar articles

Possible solution for extraction of gas-bearing coal seams by highly productive mining complexes
2012 A. V. Leisle
Geotechnical engineering providing of stability analysis of buildings and structures erected оn the upper vendian clays (Saint Petersburg)
2012 A. M. Zhukova
Environmental monitoring of the north ecosystems exposed to an impact of the mining
2012 A. V. Strizhenok