Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. Research based on physical (with the use of equivalent materials) and mathematical (finite element method) modelling has been carried out. The requirement for pilot work before industrial scale use is established.
References
- Глушихин Ф.П. Моделирование в геомеханике / Ф.П.Глушихин, Г.Н.Кузнецов, М.Ф.Шклярский. М., 1991. 240 с.
- Кузнецов Г.Н. Моделирование проявлений горного давления / Г.Н.Кузнецов, М.Н.Будько, Ю.И.Васильев. Л., 1968. 280 с.
Similar articles
Features land recultivation, disturbed as a result of activities of dzhidinsky mining treatment complex
2012 S. I. Fomin, E. L. Ubugunov, V. A. Shevelev
Analysis of the effectiveness of regulations in the subsoil usage (illustrated on regulating the level of cost oil under psas)
2012 N. E. Chebaeva