Submit an Article
Become a reviewer
Vol 195
Pages:
19
Download volume:
Geology

Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions

Authors:
R. E. Dashko1
E. N. Kovaleva2
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
Date submitted:
2016-11-22
Date published:
2012-01-01

Abstract

In article researched difficult hydro-geological conditions of the Jakovlevsky deposit rich  iron ores on which mining going under not-drained high-pressured bottomcoal water-bearing  horizon. The purpose spent monitoring is resulted. The comparative analysis of results of three  cycles of a hydro-geological monitoring which has shown gradual expansion of front of an over  flowing of underground waters from not-drained horizon is made. Negative consequences of  such process are specified. The development features of various biological forms of a life in  mine which destroy construction materials are noted. Actions for decrease in consequences of an  overflowing are planned.

Go to volume 195

References

  1. Гусев В.Н. Основные принципы организации развития гидрогеомеханического мониторинга в подземных выработках Яковлевского рудника / В.Н.Гусев, Р.Э.Дашко, Н.С.Петров // Записки Горного института. СПб, 2006. Т.168. С. 132-139.
  2. Дашко Р.Э. Исследование возможности прорывов подземных вод из нижнекаменноугольного водоносного горизонта в горные выработки Яковлевского рудника / Р.Э.Дашко, А.В.Волкова // Записки Горного института. СПб, 2006. Т.168. С.142-149.
  3. Дашко Р.Э. Микробная деятельность в подземных выработках и ее влияние на свойства богатых железных руд и конструкционных материалов / Р.Э.Дашко, А.В.Волкова, Д.Ю.Власов // Записки Горного института. СПб, 2006. Т.168. С.165-174.

Similar articles

Possible solution for extraction of gas-bearing coal seams by highly productive mining complexes
2012 A. V. Leisle
The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Approach to perfection and progress of the industrial infrastructure (on the example of the deposit «Glubokoe» on extraction of plaster in the Arkhangelsk area)
2012 V. A. Modyanova
Automatic compensation of influence of stirring factors on measurement of coal bulk weight from the clearing face
2012 R. M. Proskuryakov, I. N. Voityuk, A. V. Kopteva
Results of researches and trial introduction of plasma-pulse action technology on deposits of Russia
2012 A. A. Molchanov, A. V. Maksyutin, R. R. Khusainov
Cause rapid wear tangential cutters
2012 V. I. Bolobov, V. L. Bolobov, M. P. Talerov, V. S. Bochkov