Submit an Article
Become a reviewer
Innovation in designing of mining plants

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Authors:
V. A. Zvezkin1
V. N. Karelin2
T. S. Mushtekenov3
  • 1 — National Mineral Resources University (Mining University)
  • 2 — ZF OJSC MMK «Norilsk Nickel»
  • 3 — ZF OJSC MMK «Norilsk Nickel»
Date submitted:
2016-11-15
Date published:
2012-04-01

Abstract

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

Go to volume 198

Similar articles

Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel', A. A. Pavlovich
Using of spatial models оf objects for geodetic monitoring of deformation processes
2012 M. G. Mustafin, A. V. Kovyazin