Submit an Article
Become a reviewer
Vladimir S. Litvinenko, N. I. Nikolaev (2012) Development of the weighted biopolimer drilling mud for workover. Journal of Mining Institute. Vol 199. p. 375.
LitvinenkoV. S., & NikolaevN. I. (2012). Development of the weighted biopolimer drilling mud for workover. Journal of Mining Institute, 199, 375. Retrieved from https://pmi.spmi.ru/index.php/pmi/article/view/5879

Development of the weighted biopolimer drilling mud for workover

Authors:
Vladimir S. Litvinenko1
N. I. Nikolaev2
Date submitted:
2016-11-14
Date published:
2012-05-01

Abstract

The results of research are related, with effective composition of process fluids for oil and gas workover.

Go to volume

Similar articles

Hydrogeological conditions effect on safety of underground space expansion during transport tunnel construction
2012 R. E. Dashko, P. V. Kotyukov, A. V. Shidlovskaya
Calculation of parameters of new method of repair of making
2012 N. N. Kas'yan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko
Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Kon'kov, A. A. Larionov