Modeling of work of elements of the combined box-shaped and pile base in weak soil
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Date submitted:
2016-11-01
Date published:
2013-05-01
Abstract
In work results of modeling of work of two options of the multipurpose underground complex being the base of the multystoried high-rise building are considered. The complex plays a role of the combined foundation. Modeling is executed taking into account stage-by-stage construction of underground and land part of the building.
Similar articles
The method of the geometric addition of forces over the most stressed slip surface in estimation of open-pit slope stability
2013 A. M. Mochalov, A. A. Pavlovich, V. A. Kubarev
Influence of changes in constructive elements of protective constructions on behavior of the soil massif near deep ditches
2013 D. A. Potemkin
The criteria for land cover classification systems of Saint Petersburg protected areas
2013 A. A. Bogolyubova