Submit an Article
Become a reviewer
Mining geomechanics

Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part

Authors:
P. A. Demenkov1
D. A. Potemkin2
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2016-11-01
Date published:
2013-05-01

Abstract

In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of  the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution   of vertical displacements are received as a result of calculations.

Go to volume 204

Similar articles

Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Experience evaluation of land in germany
2013 E. N. Bykova
Application of high-precision methods of laser scanning at creation of the detailed digital copies of objects
2013 V. V. Kulesh, G. I. Khudyakov