Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Date submitted:
2016-10-31
Date published:
2013-05-01
Abstract
Presents the results of full-scale observation of the state of rail crane tracks in the period of their operation. It is established, that at a geodetic control of a craft of the crane equipment, special attention should be paid to the bridge cranes and the status of crane rails in the plan.
References
- А.с. 734502 СССР. (51) М. Кл.² G 01 B 11/24.
- Устройство для контроля неплоскостности / Н.А.Гусев, В.Г.Потюхляев. Опубл. 1980. Бюл. № 18.
- Донских И.Е. Створный метод измерения смещений сооружений. М.: Недра, 1974. 192 с.
- Потюхляев В.Г. Об организации геодезического обслуживания цехового кранового оборудования / В.Г.Потюхляев, М.В.Шалыгин // Маркшейдерское дело и геодезия / Ленинградский горный институт. Л., 1987. С.47-51.
- Правила устройства и безопасной эксплуатации грузоподъемных кранов. М.: Металлургия, 1973. 192 с.
- Румшиский Л.З. Элементы теории вероятностей. М.: Наука, 1976. 240 с.
- Сытник В.С. Строительная геодезия. М.: Недра, 1974. 136 с.
Similar articles
Estimation of quality of environment with the use of small pilotless aircrafts
2013 M. A. Pashkevich, Yu. D. Smirnov, A. S. Danilov
The method of the geometric addition of forces over the most stressed slip surface in estimation of open-pit slope stability
2013 A. M. Mochalov, A. A. Pavlovich, V. A. Kubarev
Limitations management of land resources is based on information support for state real estate cadastre
2013 V. A. Kiselev, A. G. Shabaev