Analysis of the effect of assembly errors on deviations from design arch sizes
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
Date submitted:
2016-10-31
Date published:
2013-05-01
Abstract
Arched bridges with suspension brackets of cables are built over the river Ohta in Saint Petersburg and the river Ishim in Astana (Kazakhstan). Each semi-arch was carried out of separate units from supporting block of the arch tightening. There are given the formulas for calculating the precision of semi-arch jointing depending on the fabrication accuracy and dimensions of its elements, on the shape and size of the arch span. Calculation examples are given for the arch bridge construction over the river Ishim in Astana.
Similar articles
The criteria for land cover classification systems of Saint Petersburg protected areas
2013 A. A. Bogolyubova
Problems of small and medium Russian towns residential development cadastral valuation
2013 O. Yu. Lepikhina, V. G. Gorelikov
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semenov