Measurement of the seismic blast wave during the construction of the pipeline trench near the existing pipeline

Authors:
R. A. Vozgrin1
L. V. Surovitskii2
  • 1 — National Mineral Resources University (Mining University)
  • 2 — «PetroGazService» LLC
Date submitted:
2016-10-26
Date published:
2013-07-01

Abstract

In this article describes how to calculate the safety charge mass during mass explosion at a pipeline trench construction which parallel to the existing underground pipeline. A method of calculating the maximum allowable velocity seismic blast wave in the mass explosions, for monitor the production of blasting. Presented the dependences of speed seismic blast waves on the parameters of drilling and blasting.

Go to volume 206

Similar articles

Assessment of efficiency of the main transport of gas in the Comi republic
2013 I. A. Machula
New effective grindind media fof drum ball mill
2013 L. S. Schitalov, A. V. Fadina, E. E. Andreev, V. V. L'vov
Optimization of work of dust supperession sprayer with use of computing modelling
2013 A. V. Ivanov, Yu. D. Smirnov