Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Similar articles
Modern technology of consumption waste management in the mining agglomeration
2014 M. Sh. Barkan, A. B. Makhovikov, E. I. Kabanov
Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining
2014 E. B. Gridina, A. V. Pasynkov
Optimization of work of dust supperession sprayer with use of computing modelling
2014 Yu. D. Smirnov, O. S. Dobrynin
Open cast geological conditions analysis and the mining units formation in ore losses and dilution determining
2014 S. I. Fomin, P. B. Kava, M. A. Marinin