Submit an Article
Become a reviewer
Ramiz A. Gasumov
Ramiz A. Gasumov
First Deputy General Director, Ph.D., Dr.Sci., Professor
JSC «SevCavNIPIgaz»
Stavropol Russia
First Deputy General Director, Ph.D., Dr.Sci., Professor
JSC «SevCavNIPIgaz»
Stavropol
Russia
0
Total cited
0
Hirsch index
  • RSCI profile
    RSCI author ID: 553953

Co-authors

Articles

  • Date submitted
    2019-12-20
  • Date accepted
    2020-09-01
  • Date published
    2020-10-13

Features of the underground storages construction in depleted oil and gas condensate fields

The paper considers the features of the underground storages (US) construction in depleted oil and gas condensate fields (DOGCFs). The requirements for the structure of the formation, corresponding to the parameters of the object for possible US creation are presented. The influence of geological, hydrogeological, mining and technical rock formation conditions on the reliability and tightness of underground storages, including underground gas storages, has been evaluated. The necessary conditions for the US design are analyzed at the example of the Ach-Su oil and gas condensate field, in the presence of a well-explored trap with acceptable parameters for the construction of an underground storage. An important aspect is the geological conditions that meet the criteria for selecting the object: the required structure, the absence of fracturing faults, high reservoir properties of the formation, a sufficient volume of the deposit for the storage. Geological conditions lay the basis for determining the individual characteristics of the US construction technology at each DOGCF. The refined results for the current gas-saturated pore volume and the rate of pressure drop in the formation are presented, which makes it possible to select improved technological indicators in the course of operation of the created US. In order to select the optimal option for the design and construction of the US, the results of economic and geological scenarios analysis were studied concurrently with the capabilities of the technological operation of the object and transport system, which can ensure the maximum daily production of the storage.

Read more
Ramiz A. Gasumov, Eldar R. Gasumov, Yulia S. Minchenko (2020) Features of the underground storages construction in depleted oil and gas condensate fields. Journal of Mining Institute. Vol 244. p. 418-427. DOI: 10.31897/pmi.2020.4.4
  • Date submitted
    2016-10-07
  • Date published
    2016-04-01

The specifics of operating minor deposits (as given by the examples of gas condensate deposits of the Northern Caucasus)

One of the most important directions in upgrading well productivity in the process of mining hydrocarbons consists in fighting with salt formation and salt deposition. Solving that problem becomes especially actual when operating deposits that are in their final stage of exploitation in complex mining and geological conditions accompanied by deposition of salts in the well foot area of oil bed and their sedimentation on the sub-surface and surface equipment. It provokes a drop in well productivity and results in off-schedule repair works. Specifics are considered of exploiting minor gas condensate deposits of the Northern Caucasus that are operated under complicated mining and geological conditions of anomalously high bed pressures, high temperatures, strong depressions on the beds and inflow of mineralized water from water saturated seams. Processes are studied of salt deposition from heavy hydrocarbons in the well foot and the bed area surrounding it. Water sample analyses data from different wells have demonstrated that the main salts carrier is the associated water, and the principal sedimenting agents are corrosion products, as confirmed by the results of microscopic studies. The dynamics is presented of salt deposition in the “well foot – wellhead – separator” system retrieved from the results of studies of reaction products in the well foot zone of oil bed. It is demonstrated that the efficiency of struggling with salt deposition in the course of mining hydrocarbons depends on comprehensive approach to the problem, the principal thrust lying with prevention of such deposition. Possible ways are considered to prevent precipitation of ferric compounds in the course of operating gas condensate wells, a way is suggested to intensify gas inflow.

Read more
R. A. Gasumov (2016) The specifics of operating minor deposits (as given by the examples of gas condensate deposits of the Northern Caucasus). Journal of Mining Institute. Vol 220. p. 556. DOI: 10.18454/pmi.2016.4.556
  • Date submitted
    2017-10-05
  • Date published
    2017-12-25

Research of mining and geological conditions for geological exploration in Pre-Caucasian region

Taking into consideration natural depletion of reserves of hydrocarbons in Mesozoic deposits of the majority of operated deposits of North Caucasus and for the purpose of further development of oil and gas producing industry in the region it is necessary to involve a carbonaceous complex of Jura of West Pre-Caucasus with the burial depth of more than 5300 m in the development. When drafting engineering design for a construction of exploratory wells in complex mining and geological conditions driven by anomalously high overburden pressure and temperature, use of thoroughly studied field geological information and taking into consideration the experience of boring similar wells is important. The paper provides analysis of geophysical data, the results of complex studies of reservoir porosity and permeability features of rocks picked out of core-samples of the first exploratory well on Krupskaya zone (porosity, permeability, electrical, acoustic, lithological characteristics), pressure-and-temperature conditions. The information obtained allowed to specify technological parameters of boring and tailing-in and to give recommendations regarding the way of exploratory wells boring and use of borehole equipment. In order to avoid the development of significant hydrodynamic pressure in the borehole which provokes gas showings it is necessary to keep on a certain level of minimal values of mud rheology parameters (dynamic shear stress τ = 70¸135 dPa; plastic viscosity η = 25¸35 mPa·s). For the purpose of real-time keeping of overbalance with anomalously high overburden pressure, control and regulation of calculated head pressure a stripper head should be included into the equipment configuration. Furthermore well head equipment and blowout preventer equipment must be designed for expected gradient of overburden pressure. 

Read more
R. A. Gasumov, V. A. Gridin, V. G. Kopchenkov, B. F. Galai, S. A. Dudarev (2017) Research of mining and geological conditions for geological exploration in Pre-Caucasian region. Journal of Mining Institute. Vol 228. p. 654. DOI: 10.25515/pmi.2017.6.654