M. G. Popov, S. V. Stepanenko Building of underground construction protected enclosing wall and method of displacement forecast of the soil. Journal of Mining Institute. Vol 199. p. 55.

Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov S. V. Stepanenko
Date submitted:
2016-11-13
Date published:

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the  pit and the main technological  solutions.

Go to volume

Similar articles

Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Influence of magnetic field on the speed metal corrosion tubing rheological properties and product borehole
M. K. Rogachev, M. I. Kuz'min, N. K. Kondrasheva
Perspectives of further development of technics and technology of shafts building in Russia with consideration of world technologies
V. A. Kurnakov, M. S. Pleshakov